In Ibiza almost any building work needs authorisation: a major works licence with a full project, or a prior notification (comunicación previa) or responsible declaration for minor works. Each of the island’s five municipalities has its own bylaws and timescales.

Scroll

Building permits

How we approach building permits in Ibiza

In Ibiza almost any building work needs authorisation: a major works licence with a full project, or a prior notification (comunicación previa) or responsible declaration for minor works. Each of the island’s five municipalities has its own bylaws and timescales.

As technical architects we prepare the project or technical documents your case requires, submit them and follow the file through, answering every request for information until the permit is granted. We know the criteria of each town hall and of the Consell d’Eivissa for rural land.

We plan the application from day one so you do not lose months: what can start with a prior notification, what needs a full project and which sector reports will be requested.

Services

Building permits in Ibiza: how we can help

  1. 01 Major works licence: project, site management and completion certificate
  2. 02 Minor works by prior notification or responsible declaration
  3. 03 First-occupation licence and completion of works
  4. 04 Legalisation of existing works and changes of use
  5. 05 Projects for pools, demolitions and façade renovations
  6. 06 Responses to requests for information and follow-up of the municipal file
Bougainvillea in bloom on a lime-washed façade with juniper beams, traditional Ibiza architecture

In detail

How we help you with building permits

  • 01

    Preliminary planning study

    Before drawing anything, we check what planning allows on your plot or premises: use, buildable area, protections and easements. It avoids surprises and refused applications.

  • 02

    Project and technical documents

    We prepare the project or technical report at the level of detail each municipality demands, including health and safety and waste management documents.

  • 03

    Legalisations and changes of use

    If the work has already been done, or you want to change the use of a home or premises, we prepare the legalisation or change-of-use project and see it through.

  • 04

    Follow-up until approval

    We submit the file, deal with technical queries and keep you informed of where your application really stands.

Process

How we obtain your permit, step by step

  1. 01

    Enquiry and feasibility

    We look at your case and tell you which procedure applies and what timescales are realistic.

  2. 02

    Documentation

    We prepare the project or technical report and gather the remaining documents.

  3. 03

    Submission

    We file the application at the town hall and respond to any requests.

  4. 04

    Approval and works

    Once the permit is granted, we can manage the works with the same team if you wish.

Frequently asked questions

Common questions about building permits in Ibiza

How long does a building permit take in Ibiza?

It depends on the municipality and the type of work. A prior notification lets you start within days; a major works licence can take several months, longer if the plot is on rural land and needs a report from the Consell. We give you a realistic estimate from the outset.

Do I need a permit to renovate the inside of my house?

Almost always. Interior renovations that do not affect the structure are usually processed as minor works through a prior notification or responsible declaration, with technical documents. If you touch the structure or façade, or add floor area, it becomes major works with a full project.

What is a prior notification (comunicación previa)?

It is the procedure for minor works that do not affect the structure or façade: the technical documents are submitted to the town hall and work can start within a few days, without waiting for a licence. We prepare and submit the documents for you.

Can you legalise work done without a permit?

If planning rules allow it to be legalised, we prepare the legalisation project and see it through. If not, we explain your options before you spend any money.

Do you work in every municipality?

Yes: Eivissa, Santa Eulària des Riu, Sant Antoni de Portmany, Sant Josep de sa Talaia and Sant Joan de Labritja, as well as Formentera.

Need a building permit in Ibiza?

Tell us about your project. We make a first visit with no obligation and send you a fixed-fee proposal.